Results:
Tag: AFLCMC
Clear
  • gatewayONE and attritableONE test moves joint force one step closer to “IoT.mil,” demonstrates F-22, F-35 first secure bi-directional data sharing

    This test was the latest demonstration of the transformative warfighting impact of the open architecture underpinning the Advanced Battle Management System.
  • B-1B Integrated Battle Station modification completed

    An eight-year project to install the Integrated Battle Station on the B-1B Lancer fleet has been completed ahead of schedule. Sixty aircraft went through the modification process that began in late 2012 and was completed in September 2020. The Integrated Battle Station was developed as three separate modifications: Fully Integrated Data Link, Vertical Situational Display Unit and Central Integrated Test System. “During development, it became obvious that modifying the same aircraft three times would be detrimental to aircraft availability and would create numerous aircraft configurations,” said William Barnes, B-1B Systems Program Manager, Air Force Life Cycle Management Center. “Thus Integrated Battle Station was born.” The Integrated Battle Station was the largest, most complicated modification ever performed on the B-1 and it gave the flight deck a whole new look.
  • Plant 42 changes leadership

    Air Force Operating Location Air Force Plant 42 changed leadership hands during a Change of Leadership Ceremony at Plant 42 in Palmdale, California, July 1.
  • Plant 42 gets special visit

    Thomas M. Fischer, Air Force Life Cycle Management Center Director of Engineering and Technical Management, headquartered at Wright-Patterson Air Force Base, Ohio, visits Edwards Air Force Base, California, and Plant 42, Oct. 3.
RSS