Photos

Duke Field breaks ground on first electric aircraft charging station
Construction workers create a path for electrical cables that will connect to the first electric aircraft charging station on a military installation at Duke Field, Florida, Sept. 19, 2023. The expected completion date for the Level 3 direct current electric vehicle fast charging station construction project is Oct. 13, 2023, weeks before BETA’s electric vertical take-off and landing aircraft arrives for testing. (U.S. Air Force photo/Samuel King Jr.)

Download Image: Full Size (1.68 MB)
Tags:
Photo by: Samuel King Jr. |  VIRIN: 230919-F-OC707-0001.JPG