Edwards Water Tower Taken Down
To prepare for the demolition of the South Base water tower, Bldg. 516, the center column was cut in advance. Just before tearing down the tower by cable, the contractors and the U.S. Army Corps of Engineers cut through one leg to weaken it and loosened the bolts. (U.S. Air Force photo by Kenji Thuloweit)
PHOTO BY:
Kenji Thuloweit
VIRIN:
140909-F-LO365-217.JPG
FULL SIZE:
0.48 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.